W E MANIN LIMITED
PROJECT EXPERIENCE



Typical Projects Experience
William Harvey Hospital, Infrastructure Upgrade M&E Design & Build - New Generators Installation, Controls, Cabling, Switchgear, Fuel Systems and Scada. £2.5m
Medway Maritime Museum £1.2m M&E Max Fordham
Dungeness DPS Infrastructure M&E £1.8m
Kent International Airport, Runway Lighting & Infrastructure Upgrades M&E & Civil (2-year project) £3m Butler & Young
Deutche Bank, Winchester House, Infrastructure Upgrades. UPS, Switchgear, Cable systems, Design & Build £1.5m
ABN AMRO 199 Bishopsgate Infrastructure Upgrades M&E Design & Build of extension to CER rooms £1.3m (Principal contractor role).
Turner Broadcasting Infrastructure Upgrades M&E Design & Build £850k
Balkanpharma / the Austin Company – Bulgaria, Site M&E Project Engineer, £3.4m
(Management off all disciplines M&E from design through to Validation).
Pfizers, Sandwich. Site Based Engineer, Various contracts £4m
MSD Pharmaceuticals, Hoddesdon, Herts. New offices & Labs £1m
BT Keybridge House HV/LV Upgrade Project, £1.2m
Milestone & Meadowfield Schools £2m
Bank of America Bromley. Floor Fit-Out. £750k
UCLH Hospital Euston Road. M&E £950k (Principal contractor role).
Medway Hospital NHS Trust – Critical Infrastructure Upgrade – Planning and Management of major switchgear change outs within a ‘Live’ Hospital environment. £900k
Cable & Wireless Data Centre – Corbieres, Paris. – New Installation, including all Electrical disciplines, Switchgear and Generator. – Fastrack Project £1.4m
Vodaphone ‘Shared Space’ Data Centre – Antwerp, Belgium. – New Installation, including all Electrical disciplines, Switchgear and Gas Suppression – Installation and Management Project £1.3m
South Quay building Canary Wharf – Infrastructure upgrade to a ‘Live’ working building with new HV/LV Switchgear, UPS system, Life critical systems and BMS system. £3.1m